Premier Scaffold Solutions
Premier Scaffold Home Premier Scaffold Solutions Premier Scaffold Contact
Premier Scaffold Solutions
Premier Scaffold Products Premier Scaffold Solutions Premier Scaffold Training Premier Scaffold Solutions Premier Scaffold Distributors Premier Scaffold Solutions Premier Scaffold Applications Premier Scaffold Solutions Premier Scaffold News
Proseries Products
Features
 Bridges and Accessories
Specifications
Documentation
Videos
State-of-the-art robotics
Industry standard systems and processes
Complete, in-house manufacturing facilities
ProSeries Hydraulic Mast Climbing System
Bridges and Accessories-Wall, Ties, Wall Mounts, Anchors
Wall Ties Bridges

Structure Diagram

Wall Tie Installation

Wall Tie Schedule
Platform Height Standard set up (2 or 4 planks)

Forward of the unit
Set up with hoist, weather protection, forward extension or 5 to 8 planks
0-35’ Free Standing Not Free Standing
36’-250’’ Every 20’ (1) Every 10’ (2)
1. Tie schedule can be 30’ if towers are pre installed to top of building.

2. Tie schedule can be 20’ if towers are pre installed to top of building.

WARNING!
Do not use the ProSeries 24 Ft. power Unit when wind speed exceeds 35 miles/hour or when wind speed exceeds 20 miles/hour when using weather protection.


Wall Mounts - Extensions

The typical male to female adjustable wall mount can reach distances between 28" and 88" (with wall mount extension). For distances over 88" contact Premier Scaffold Solutions.

Floor Mounts
Angle brackets may be required for installing wall mounts through window openings. Floor or wall type anchors will need to be used for this type of application with the fl oor mount tower bracket adapter. Also note that the maximum allowable angle between the fl oor and tower rungs is 30 degrees.


Anchors

Before attaching towers to the building using the tie system, it will be necessary to install anchors to a solid building structure. Concrete slabs, columns, steel beams, relief angles and other structural members can be used provided that a 3,000 lb tension/compression and 1,000 lb shear force can be applied. Use 1/2" x 6" fasteners when tying the anchors to the building structure. There are 5 types of anchors you can use depending on the building structure.

Anchor Placement


Beam Anchor

Floor or Wall Anchor

Reuseable Anchor

Welded Anchor

Fixed Anchor

Mast-Climber Features

Site Menu

Premier Scaffold Training
Premier Scaffold Distributors
Premier Scaffold Applications
Premier Scaffold Accessories
Premier Scaffold Specifications
Premier Scaffold Videos
Scaffold Documentation

Home
Contact Us
News

Contact Information

For more information, please contact
Premier Scaffold Solutions
(866) 542-1944

Premier Scaffold Solutions
6677 Broughton Ave.
Columbus, OH 43213

© 2012 Premier Scaffold Solutions.
All rights reserved