 |
 |
 |
 |
 |
 |
 |
 |
| State-of-the-art robotics |
 |
| Industry standard systems and processes |
 |
| Complete, in-house manufacturing facilities |
|
|
Towers and How They Connect - Back

Don't have access to a stairway or opening in the building? Go ahead and climb the ProSeries tower up to heights of 70 feet with a full body harness and a retracting lifeline.
Tower Installation
- Install each 5' tower section, making sure rungs line up with subsequent tower.
- Slide the 5/8 x 6 1/2" toggle bolt, washer & nut onto the connecting lug and hand tighten.
- Torque all toggle bolts to 120 ft-lb in a diagonal pattern from corner to corner.
- Raise the platform, repeat steps 1, 2 & 3.
- Maintain plumb condition throughout the tower installation process.

|