Premier Scaffold Solutions
Premier Scaffold Home Premier Scaffold Solutions Premier Scaffold Contact
Premier Scaffold Solutions
Premier Scaffold Products Premier Scaffold Solutions Premier Scaffold Training Premier Scaffold Solutions Premier Scaffold Distributors Premier Scaffold Solutions Premier Scaffold Applications Premier Scaffold Solutions Premier Scaffold News
Proseries Products
Features
 Bridges and Accessories
Specifications
Documentation
Videos
State-of-the-art robotics
Industry standard systems and processes
Complete, in-house manufacturing facilities
ProSeries Hydraulic Mast Climbing System-Features

Towers and How They Connect - Back

 

Don't have access to a stairway or opening in the building? Go ahead and climb the ProSeries tower up to heights of 70 feet with a full body harness and a retracting lifeline.

 

 

 

Tower Installation

  1. Install each 5' tower section, making sure rungs line up with subsequent tower.
  2. Slide the 5/8 x 6 1/2" toggle bolt, washer & nut onto the connecting lug and hand tighten.
  3. Torque all toggle bolts to 120 ft-lb in a diagonal pattern from corner to corner.
  4. Raise the platform, repeat steps 1, 2 & 3.
  5. Maintain plumb condition throughout the tower installation process.

Mast-Climber Features

Site Menu

Premier Scaffold Training
Premier Scaffold Distributors
Premier Scaffold Applications
Premier Scaffold Accessories
Premier Scaffold Specifications
Premier Scaffold Videos
Scaffold Documentation

Home
Contact Us
News

Contact Information

For more information, please contact
Premier Scaffold Solutions
(866) 542-1944

Premier Scaffold Solutions
6677 Broughton Ave.
Columbus, OH 43213

© 2012 Premier Scaffold Solutions.
All rights reserved